Logo von Berliner Wasserbetriebe
Life Science

Berliner Wasserbetriebe

New laboratory building of Berliner Wasserbetriebe at the Jungfernheide site

Architecture and Image: LKK Lehrecke Kammerer Keiß

Gross floor space:
ca. 7,248 m²

Floor space 1-7 according to
German DIN 277-1:

ca. 3,454 m²

Lab space:
ca. 1,900 m²

Costs of the technical systems:
ca. 9.0 m EUR plus VAT

Project run time:
since 2022

  • Physical, chemical, physico-chemical, biological and microbiological laboratories for the analysis of drinking water, ground and surface water, sludge, waste water and gas
  • Safety level S1 and S2 laboratories according to GenTG
  • Planning of all facility groups
  • Layout and laboratory planning
  • •esting laboratory according to ISO/IEC 17025
  • Certification according to the assessment system for sustainable building (BNB): Silver service
  • phases according to HOAI
    • basic evaluation to draft planing
Logo von Charité – Universitätsmedizin Berlin
Life ScienceResearch and teaching

Charité – Universitätsmedizin Berlin

New construction for the Berlin Center for Advanced Therapies (BeCAT)

Entwurf: DGI Bauwerk, Berlin
Visualisierung: IMAGINA | Visual
Collaboration

  • Development and application of Advanced Therapy Medicinal Products (ATMP)
  • 4 independent GMP clean room units
  • Laboratories of the security level 2 according to German BioStV and GenTSV
  • Cryo storage, cold storage cells (4 °C and
  • -20 °C) as well as ultra-low freezers (-80 °C)
  • Engineering of any technical systems
  • Layout and lab design
  • GMP clean room planning
  • Service phases according to German HOAI
    • Preliminary engineering and basic engineering
  • Qualification according to GMP

Gross floor space:
ca. 3.480 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 1.242 m²

Clean room space:
ca. 800 m²

Clean room classes:
A to D according to annex 1 of the GMP guideline

Costs of the technical systems:
ca. 13.1 m EUR plus VAT

Project run time:
since 2018

Logo von Westsächsische Hochschule Zwickau - University of Applied Sciences
Research and teaching

Westsächsische Hochschule Zwickau - University of Applied Sciences

New construction of the High-technology Center in Zwickau

Architecture and image: Architekturbüro Raum und Bau GmbH – Architektengemeinschaft Zimmermann

  • New research and teaching building including historic structures
  • Micro and nanostructruring, optic technology, medical technology as well as physics
  • Labs, measuring and clean rooms, practical training rooms as well as offices
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 7,960 m²
Floor space 1-6 according to German DIN 277-1:
ca. 2,600 m²
High-technology platform/
Clean room space:

ca. 800 m²
Clean room classes:
7, 5 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 16.0 m EUR plus VAT
Project run time:
since 2016

Logo von Fraunhofer Institute for Telecommunications Heinrich Hertz Institute (HHI)
Research and teaching

Fraunhofer Institute for Telecommunications Heinrich Hertz Institute (HHI)

Renewal of refrigeration and expansion of process cooling water system for the Fraunhofer HHI at Berlin

Source: 20200531 IMG 0307 by sebaso-2.jpg

  • Conversion of the refrigeration systems during operation
  • Engineering of
    • Sanitary and refrigeration systems
    • Power systems
    • Process refrigeration systems
    • Building automation systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Preliminary measure extension of process cooling system with plate heat exchanger and high-pressure centrifugal pumps
Renewal of two cooling machines 6/12 °C: 800 kW cooling capacity including recooling plant
New construction of refrigeration center with three cooling machines: 750 kW cooling capacity including recooling plant
Costs of the technical systems:
ca. 1,3 Mio. EUR plus VAT
Project run time:
2016-2020

Logo von Halbleiterlabor der Max-Planck-Gesellschaft
Research and teachingSemi-conductors

Halbleiterlabor der Max-Planck-Gesellschaft

New construction of the MPG Halbleiterlabor (semiconductor laboratory) in Garching

Architecture and image:
Carpus+Partner AG, Aachen

  • Research clean room for developing of semiconductor radiation detectors
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Currently detail engineering

Gross floor space:
ca. 6,650 m²
Clean room space:
ca. 1,500 m²
Clean room classes:
8 to 3 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 12.3 m EUR plus VAT
Project run time:
since 2016

Logo von Universität Regensburg
Research and teaching

Universität Regensburg

New construction of the Regensburg Center for Ultrafast Nanoscopy (RUN)

Entwurf: Fritsch + Tschaidse Architekten

Gross floor space:
ca. 6.304 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 2.044 m²

Clean room space:
ca. 700 m²

Clean room class:
8 according to DIN EN ISO 14644-1

Costs of the technical systems:
ca. 8.1 m EUR plus VAT

Project run time:
since 2018

  • Interdisciplinary research (biology / preclinical medicine, chemistry / pharmacy, physics)
  • Microscopy and wet labs, auditorium, offices and seminar rooms
  • Labs of the security levels 1 and 2 acc. to German GenTSV
  • Engineering of the facility groups 1 - 3, 7 and 8
  • Layout and lab design
  • Service phases according to German HOAI
    • Pre-planning to project supervision
Logo von Friedrich-Alexander-Universität Erlangen-Nürnberg
Research and teaching

Friedrich-Alexander-Universität Erlangen-Nürnberg

New construction for technical chemistry at the Friedrich-Alexander University Erlangen-Nürnberg

doranthpostarchitekten

Gross floor space:
ca. 14,000 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 5,330 m²

Lab space:
ca. 2,940 m²

Costs of the technical systems:
ca. 18.3 m EUR plus VAT

Project run time:
since 2020

  • Chemistry and physics laboratories, special laboratories (electron microscopy rooms and high-pressure laboratory), some with special structural and technical requirements
  • Separate air conditioning systems with increased requirements for special laboratories and hazardous materials storage facilities
  • Office, social and meeting rooms, seminar rooms, workshops and storage areas
  • Planning of all facility groups (1-3, 7 and 8) except electrical and laboratory planning
  • Service Phases according to HOAI
    • pre-Planing to project monitoring
Logo von Freie Universität Berlin
Research and teaching

Freie Universität Berlin

New construction of the Institute for Food Safety and Hygiene (ILH) in Berlin

wulf architekten

Gross floor space:
ca. 5,063 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 2,000 m²

Costs of the technical systems:
ca. 5,4 Mio. EUR plus VAT

Project run time:
since 2018

  • Teaching rooms, laboratories, technical center, demonstration section hall, offices and meeting rooms
  • Labs of the security level 2 according to German BioStoffV as well as GenTSV
  • Engineering of any technical systems
  • Layout and lab design
  • Service phases according to German HOAI
    • pre-planning to preparation of the contract awarding
  • Certification according to the German Evaluation system Sustainable Building (BNB): Gold
Logo von Technische Universität Chemnitz
Research and teachingSemi-conductors

Technische Universität Chemnitz

Replacement clean room Center for Microtechnologies (ZfM) at the Chemnitz University of Technology

heinlewischer

 

Gross floor space:
ca.  17,485 m²

Floor space 1-6 according to
German DIN 277-1:

ca.  2,836 m²

Clean room space:
ca. 1,600 m²

Clean room classes:
4 to 7 according to DIN EN ISO 14644-1

the technical systems:
ca.  25,4 Mio EUR plus VAT

Project run time:
2020-today

  • Clean rooms, workshops, physics laboratory, offices and storage areas 
  • Planning of all technical installations incl. clean room equipment/furnishing
  • Creation and updating of the technical room book
  • Proportionate participation in
    • Creation of fire matrix
    • Technical monitoring and commissioning management
  • Service phases according to HOAI 
    • Basic evaluation to draft planning
Logo von Max-Planck-Gesellschaft zur Förderung der Wissenschaften e. V.
Research and teaching

Max-Planck-Gesellschaft zur Förderung der Wissenschaften e. V.

New construction of an extension building for the Max Planck Institute for Microstructure Physics in Halle

Burckhardt+Partner GmbH

  • Multidisciplinary research with physical, chemical, biological-medical laboratories, including S2 according to GenTSV
  • Engineering of
    • Sewage, water, gas and heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Clean room construction
    • Media supply systems
    • Medical and laboratory systems
    • Building automation systems
  • Service phases according to German HOAI
    • Pre-planning to project supervision

Gross floor space:
ca. 12.535 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 5.650 m²

Clean room space:
ca. 700 m²

Clean room class:
7 to 5 according to DIN EN ISO 14644-1

Costs of the technical systems:
ca. 20,9 m EUR plus VAT

Project run time:
since 2019

Logo von Friedrich-Alexander University Erlangen-Nürnberg
Research and teaching

Friedrich-Alexander University Erlangen-Nürnberg

Renewal of Ultrapure Water Treatment Systems

© DERU-Bestehende Reinstwasseranlage

  • Ultrapure water treatment for diverse process equipment for semiconductor prototype production
  • Upgrading during ongoing research operation
  • DERU as general planner
    • Planning of all facility groups except conveyos
    • Structural design by BGF Baubüro Freiberg GmbH
  • Dismantling of existing ultrapure water treatment
  • retrofitting of the room, room-in-room construction in steel design
  • Commissioning of the new ultrapure water plant Work phases according to HOAI
    • Pre-planning to construction supervision

Ultrapure water quality:
according to SEMI standard

Cleanroom space:
ca. 600 m², ISO 4 nach ISO 14644-1
ca. 400 m², ISO 6 nach ISO 14644-1

 

Costs of the technical systems:
ca. 3,3 EUR plus VAT

Project run time:
since 2020

Logo von TGZ Halle Technologie- und Gründerzentrum Halle GmbH
Life Science

TGZ Halle Technologie- und Gründerzentrum Halle GmbH

New construction of the Innovation Hub at the Technology and Start-up Center in Halle (Saale)

ARGE Dietrich + Untertrifaller Architekten + Aline Hielscher Architektur

  • Incubator for start-ups in the fields of biomedicine and life sciences
  • Flexible reusable workshop, production laboratory and office space
  • Planning of all technical facilities
  • 33 underground parking spaces
  • Service phases according to HOAI
    • Basic evaluation to project supervision/support

Gross floor space:
ca. 4.929 m²

Floor space 1-6 according to
German DIN 277-1:

ca. 2.145 m²

Costs of the technical systems:
ca. 4.0 million euros plus VAT

Project run time:
since 2022

Logo von Bavaria Film GmbH
Life Science

Bavaria Film GmbH

Erneuerung und Erweiterung der Gebäudeautomation für die Liegenschaft der Bavaria Film GmbH in Geiselgasteig

Bavaria

  • Erneuerung der Managementebene bis 15.000 Datenpunkte
  • Teilmigration Automationsebenen mit offener BACnet-Technologie 5.000 Datenpunkte
  • Ausschreibung einer Energiemanagementsoftware
  • Beratung einschließlich Erstellung eines Marktspiegels für Gebäudeleittechnik- Software
  • Ausschreibung eines Rahmenvertrags
  • Leistungsphasen nach HOAI
    • Vor- und Entwurfsplanung, Ausführungsplanung sowie Vorbereitung und Mitwirkung bei der Vergabe

Kosten der technischen Anlagen:
ca. 616.380 EUR zzgl. USt. (Kostenberechnung)

Projektlaufzeit:
seit 01/2022

Logo von AEMtec GmbH
Semi-conductors

AEMtec GmbH

New construction of an extension building including clean room and offices in Berlin

AEMtec GmbH

  • General engineering
    • Building
    • Supporting structure
    • Technical systems
    • Outdoor facilities
  • Service phases according to German HOAI
    • Pre-planning to supervision/support

Gross floor space:
ca. 3,944 m²

Clean room space:
ca. 1,483 m²

Clean room classes:
8, 7 and 6 according to
DIN EN ISO 14644-1

Costs of the technical systems:
ca. 2.9 m EUR plus VAT

Project run time:
2018-2022, currently service phase 9

Logo von Fraunhofer Institute for Integrated Systems and Device Technology
Research and teaching

Fraunhofer Institute for Integrated Systems and Device Technology

Renewal of cooling machines and drycoolers for the Fraunhofer IISB at Erlangen

Photo: DERU 

  • Conversion of the refrigeration systems during operation
  • Renewal of power supply lines and MSR technology
  • Engineering of
    • refrigeration systems
    • Power systems
    • User-specific systems
    • Building automation systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Renewal of cooling machines 6/12 °C: approx. 600 kW cooling capacity
Installation of rental cooling machines: approx. 500 kW cooling capacity
Installation of two turbo cooling machines 12/17 °C: approx. 690 kW cooling capacity
Installation of two hybrid dry coolers: approx. 850 kW re-cooling capacity
Costs of the technical systems:
ca. 1,5 Mio. EUR plus VAT
Project run time:
10/2016-09/2017 (Subproject 1)
04/2018-02/2021 (Subproject 2-4)

Logo von Friedrich-Alexander Universität Erlangen-Nürnberg
Research and teaching

Friedrich-Alexander Universität Erlangen-Nürnberg

New construction of the Erlangen Centre for Astroparticle Physics (ECAP)

Architecture and image:
Dichter + Glass Kramer Löbbert Architekten, Berlin

  • University research in astroparticle physics
  • Labs and assembly halls, offices and meeting rooms
  • Engineering of
    • Gases, compressed air, helium recovery systems, gas detection systems
    • Lab equipment and special internals
    • Fire-extinguishing systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 9,170 m²
Floor space 1-6 according to German DIN 277-1:
ca. 3,500 m²
Lab space:
ca. 2,330 m²
Costs of the technical systems:
ca. 1.6 m EUR plus VAT
Project run time:
2017-2022

Logo von Leibniz Institute for Natural Product Research and Infection Biology Hans Knöll Institute
Research and teachingLife Science

Leibniz Institute for Natural Product Research and Infection Biology Hans Knöll Institute

New construction of the HKI Biotech Center in Jena

Architecture and image: Nickl & Partner Architekten AG, Berlin

  • Chemical, analytics and  cell culture labs as well as  electrophoresis and PCR labs
  • Labs of the security level 2 according to German GenTG
  • Offices and seminar area
  • Engineering of
    • Power systems
    • Telecommunication and IT systems
    • Elevator
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 5,730 m²
Floor space 1-6 according to German DIN 277-1:
ca. 2,095 m²
Lab space:
ca. 890 m²
Costs of the technical systems:
ca. 2.8 m EUR plus VAT
Project run time:
2017-2022

Logo von Wismut GmbH
Research and teaching

Wismut GmbH

New construction of a functional building in Königstein / Leupoldishain

Architecture: BBF Baubüro Freiberg GmbH

Photo: DERU

  • Remediation of uranium mining legacies
  • Engineering of
    • Sewage, water and heat supply systems
    • Partial air conditioning and refrigeration systems
    • Compressed air and gas supply systems (nitrogen, argon, methane, ammonia)
    • Lab equipment
    • Process exhaust air systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 3,075 m²
Floor space 1-6 according to German DIN 277-2:
ca. 1,340 m²
Lab space:
ca. 240 m²
Costs of the technical systems:
ca. 2.1 m EUR plus VAT
Project run time:
2015-2021

Logo von Fraunhofer Institute for Integrated Circuits
Research and teaching

Fraunhofer Institute for Integrated Circuits

New construction of the Institute Division EAS for the Fraunhofer IIS in Dresden

Architecture and image: Heinle, Wischer und Partner Freie Architekten

  • Electronics labs, experimental halls and measuring rooms, offices and meeting rooms, cafeteria and library
  • Engineering of
    • Power systems
    • Telecommunication and IT systems
    • Elevator
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 11,190 m²
Floor space 1-6 according to German DIN 277-1:
ca. 4,560 m²
Lab and experimental space:
ca. 990 m²
Costs of the technical systems:
ca. 3.2 m EUR plus VAT
Project run time:
2016-2021

Logo von Friedrich-Alexander Universität Erlangen-Nürnberg
Research and teaching

Friedrich-Alexander Universität Erlangen-Nürnberg

New construction of an Interdisciplinary Centre for nanostructured film (IZNF) in Erlangen

Architecture: doranth post architekten GmbH, München

Photo:DERU

  • 50 physical and chemical labs, including FIB and TEM measuring rooms as well as labs of the security level 2, offices
  • Engineering of
    • Sewage, water and heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Clean room construction
    • Media supply systems
    • Building automation system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 11,300 m²
Floor space 1-6 according to German DIN 277-2:
ca. 4,640 m²
Lab space:
ca. 1,725 m²
Clean room space:
ca. 170 m²
Clean room class:
8 acc. to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 6.8 m EUR plus VAT
Project run time:
2014-2019

Logo von Fraunhofer Institute for Integrated Systems and Device Technology
Research and teaching

Fraunhofer Institute for Integrated Systems and Device Technology

New construction of an extension building in Erlangen

Architecture: weinbrenner.single.arabzadeh, architektenwerkgemeinschaft
Image: 3DBO
Grafik +Visualisierung,
Andreas Boldt

  • Labs and working rooms, technical centre for HVDC systems, workshops as well as offices
  • Engineering of
    • Sewage, water and heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Media supply systems
    • Special equipment
      • CHP and industrial scale refrigeration storage
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 4,220 m²
Floor space 1-6 according to German DIN 277-2:
ca. 1,920 m²
Technical centre and lab space:
ca. 1,170 m²
Costs of the technical systems:
ca. 2.1 m EUR plus VAT
Project run time:
2014-2019

Logo von Technische Universität Chemnitz
Research and teaching

Technische Universität Chemnitz

New construction of the Centre for materials, architectures and integration of nanomembranes (MAIN) in Chemnitz

Architecture and image: Heinle, Wischer und Partner, Dresden

  • Physical and chemical labs as well as clean rooms
    • Altogether 11 lab cluster
  • Engineering of any technical systems
    (except conveying systems)
  • Layout and lab design
  • Hook up engineering
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Support

Gross floor space:
ca. 9,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 3,800 m²
Clean room space:
ca. 400 m²
Clean room class:
7 to 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 11.4 m EUR plus VAT
Project run time:
2013-2019

Logo von Mechanical Engineering
Semi-conductors

Mechanical Engineering

Installation of a clean room for EUV systems in Ditzingen

Photo: DERU

  • Integration of large-scale clean rooms into a new building
  • Engineering of
    • Clean room walls
    • Raised floors
    • Furnishing of the clean room wardrobes
  • Service phases according to German HOAI
    • Basic engineering (as consulting service),
    • Detail engineering
    • Preparation of bid invitations
    • Assistance in the award procedures
    • Construction supervision (partly)

Clean room space:
ca. 3,100 m²
Clean room classes:
8 to 5 according to DIN EN ISO 14644-1
Project run time:
2016-2018

Logo von European X-Ray Free-Electron Laser Facility GmbH
Research and teaching

European X-Ray Free-Electron Laser Facility GmbH

New construction of the main building in Schenefeld

Architecture and image: BLUNCK+MORGEN, Hamburg

  • Labs of the security levels 1 and 2 according to German GenTG, laser rooms, cleanrooms as well as offices
  • Engineering of any technical systems (except conveying systems) for the main building above ground
  • Layout and lab design
  • Engineering of media and energy supply systems in the subterranean experimental hall
  • Services phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 16,765 m²
Main floor space:
ca. 8,000 m²
Lab space:
ca. 2,400 m²
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2012-2017

Logo von University of Applied Sciences Mittweida
Research and teaching

University of Applied Sciences Mittweida

New construction of the Institute for Laser Technology in Mittweida

Architecture: pbr Planungsbüro
Rohling AG

Photo: DERU

  • Labs and clean rooms, offices and meeting rooms
  • Engineering of
    • Clean room ventilation systems
    • Clean room construction
    • Media supply systems
    • Laboratory equipment
    • Process refrigeration and process exhaust air systems
    • Building automation systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 6,410 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,650 m²
Clean room space:
ca. 500 m²
Clean room classes:
8 and 6 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2012-2017

Logo von IHP GmbH Leibniz-Institut für Innovative Mikroelektronik
Semi-conductorsResearch and teaching

IHP GmbH Leibniz-Institut für Innovative Mikroelektronik

Enlargements, conversion and restructuring measures at the IHP in Frankfurt (Oder)

Photo: DERU

  • Tender procedures for general agreements of executing firms (technical as well as structural systems)
  • New construction and conversion of central media systems
  • Conversion of chemical and  physical labs
  • Installation of the Nano lab clean room
  • Hook up engineering
  • Services phases according to German HOAI
    • Preliminary engineering to construction supervision

Spaces:
ca. 450 m² (labs)
ca. 300 m² (Nano lab clean room)
ca. 280 m² (work shop)
Clean room class:
6 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 3 m EUR plus VAT
Project run time:
2014-2016

Logo von Forschungsinstitut für Leder und Kunststoffbahnen FILK
Life ScienceResearch and teaching

Forschungsinstitut für Leder und Kunststoffbahnen FILK

Installation of a lab and communication complex in Freiberg

Photo: DERU

  • Chemical-physical labs, partially labs of the security levels 1 and 2 according to German GenTG
  • Offices, meeting and seminar rooms, aula and lecture room as well as cafeteria
  • Engineering of any technical systems
    (except conveying systems)
  • Layout and lab design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 5,155 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,590 m²
Lab space:
ca. 1,250 m²
Costs of the technical systems:
ca. 3.9 m EUR plus VAT
Project run time:
2010-2016

Logo von Freiberg City Administration
Research and teaching

Freiberg City Administration

Inside modernisation of the historical granary in Freiberg

Photo: DERU

  • Late Gothic storehouse
  • City library and commercial units
  • Engineering of
    • Heat supply, sanitary and ventilation systems
      • Heat pumps with geothermal probe
      • Wall surface heating
    • Building automation systems
  • Calculation of profitability
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
    • Support

Gross floor space:
ca.  4,290 m²
Gross volume capacity:
ca. 16,470 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,030 m²
Costs of the technical systems:
ca. 730,000 EUR plus VAT
Project run time:
2013-2015
(Support 2015-2020)

Logo von Fraunhofer Institute for Silicon Technology
Research and teachingSemi-conductors

Fraunhofer Institute for Silicon Technology

New construction of a second clean room in Itzehoe

Architecture and image: HTP Architekten, Brunswick

  • Research clean room for developing
    • Components of power electronics
    • Novel microsensors
  • Engineering of any technical systems
  • Layout design
  • Hook up engineering
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Support
  • Project coordination

Gross floor space:
ca. 12,170 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,500 m², thereof
ca. 1,500 m² clean room space
Clean room class:
5 according to DIN EN ISO 14644-1 (partially ISO 4)
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2009-2015
(Support 2015-2020)

Logo von Fraunhofer Institute for Transportation and Infrastructure Systems
Research and teaching

Fraunhofer Institute for Transportation and Infrastructure Systems

New construction of a technical centre with connected oval test track in Dresden

Architecture: KILIANARCHITEKTEN, Dresden

Photo: DERU

  • Technical centre including
    • Test hall and car workshop
    • Engine and battery test benches
    • Measuring rooms and offices
    • Crane way 2.5 t
  • Transfer of the existing container location
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 1,615 m²
Floor space 1-6 according to German DIN 277-2:
ca. 990 m²
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2011-2015

Logo von Helmholtz-Zentrum Dresden-Rossendorf e. V.
Research and teaching

Helmholtz-Zentrum Dresden-Rossendorf e. V.

Preparation for the set up of a Super-SIMS in Dresden-Rossendorf

Photo: HZDR

  • Set up of a Super-SIMS in the 6 MV tandem accelerator hall
  • High-voltage protection
    (30 kV)
  • Engineering of
    • Ventilation systems and room-in-room construction
    • Power, Telecommunication and IT systems
    • Media supply systems
    • Building automation systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

SIMS = Secondary ion mass spectrometry

  • Ultrasensitive analytical method for the determination of stable elements and isotopes

Accelerator hall:
Radiation protection controlled area
Costs of the technical systems:
ca. 300,000 EUR plus VAT
Project run time:
2012-2014
 

Logo von Helmholtz-Zentrum Dresden-Rossendorf e. V.
Research and teaching

Helmholtz-Zentrum Dresden-Rossendorf e. V.

Installation of a helium liquefaction plant including high pressure depot in Dresden-Rossendorf

Photo: DERU

  • New construction of a building as well as installation of the helium liquefaction plant
  • Engineering of
    • Sewage and water systems
    • Ventilation and air-conditioning systems
    • Power systems
    • Telecommunication and IT systems
    • Media supply systems
    • Building automation systems
  • Service phases according to German HOAI
    • Basic engineering to construction supervision

Gross floor space:
ca. 285 m²
Gross volume capacity:
ca. 1,800 m³
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
35 m³ geometric storage volume at 200 bar
Costs of the technical systems:
ca. 620,000 EUR plus VAT (without liquefaction plant)
Project run time:
2012-2014

Logo von Crime scene task force at Landeskriminalamt Magdeburg
Life Science

Crime scene task force at Landeskriminalamt Magdeburg

Dactyloscopic lab in Magdeburg

Photos: DERU

  • Forensic lab of the security level 2 according to German GenTG
  • Engineering of lab systems as
    • Dissecting table with air supply element
    • 4 laboratory fume hoods coated with stainless steel, one of it walk-in
    • Air locks for material and staff
  • Service phase according to German HOAI
    • Preliminary engineering to construction supervision

Floor space 1-6 according to German DIN 277-2:
ca. 153 m²
Costs of the technical systems:
ca. 163,000 EUR plus VAT
Project run time:
2012-2014

Logo von Technical University Dresden
Research and teachingSemi-conductors

Technical University Dresden

New construction of a research facility at the Mierdel building in Dresden

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of
    • Technical gases, compressed air, central vacuum systems
    • Gas detection systems
    • HPW systems
    • Process cooling water systems
    • Lab equipment
  • Layout design
  • Hook up engineering
  • Service phase according to German HOAI
    • Preliminary engineering to construction supervision
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 7,320 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,268 m²
Number of tools:
48
Costs of the technical systems:
ca. 1.3 m EUR plus VAT
Project run time:
2009-2013

Logo von Fraunhofer Institute for Machine Tools and Forming Technology
Research and teaching

Fraunhofer Institute for Machine Tools and Forming Technology

New construction of a model factory for resource efficient production in Chemnitz

Architecture: Stefan Ludes Architekten, Berlin

Photo: DERU

  • Set up of an energy self-sufficient factory with
    • CHP
    • Energy storage system flywheel mass
      (only planning)
    • Photovoltaics systems
  • Engineering of
    • Power systems
    • Telecommunication and IT systems
    • Conveyor systems (crane way 40 t)
    • Building automation systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 3,420 m²
Gross volume capacity:
ca. 35,290 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,150 m²
Costs of the technical systems:
ca. 2.2 m EUR plus VAT
Project run time:
2010-2013

Logo von Pharmaceutical production
Life Science

Pharmaceutical production

Consulting services for a conversion project in Dresden
  • Conversion of pharmaceutical work rooms, stores, cold rooms and airlocks
  • Hook up to existing basic supply systems
  • Consulting for
    • Ventilation and air-conditioning systems
    • Building automation system

Space:
ca. 200 m²
Clean room class:
D according to annex 1 of the GMP guideline
Project run time:
06/2013-07/2013

Logo von AEMtec GmbH
Semi-conductors

AEMtec GmbH

New construction of a production facility including a clean room in Berlin

Architecture and image: BBF Baubüro Freiberg GmbH

  • General engineering
    • Building
    • Supporting structure
    • Technical systems
    • Outdoor facilities
  • Service phases according to German HOAI
    • Preliminary engineering to support

 

Gross floor space:
ca. 5,500 m²
Clean room space:
ca. 2,000 m²
Clean room classes:
8 and 7 according to DIN EN ISO 14644-1
Project run time:
2011-2013
(Support 2013-2018)

 

Logo von Technical University Dresden
Research and teaching

Technical University Dresden

Conversion and modernisation of the Walther-Hempel building for the chemical institutes in Dresden

Architecture: AWB Architekten, Dresden 

Photo: DERU

  • Set up in 1962 in reinforced concrete skeleton construction
  • Technical, macromolecular as well as specific physical chemistry, NMR spectrometer
  • Engineering of
    • Sewage, water and gas systems
    • Heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Media supply systems
    • Building automation systems
  • Service phases according to German HOAI
    • Basic engineering to construction supervision

Gross floor space:
ca. 5,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,430 m²
Lab space:
ca. 1,560 m²
Costs of the technical systems:
ca. 2.3 m EUR plus VAT
Project run time:
2008-2013

Logo von Bosch Solar Energy AG - Bosch Solar Wafers GmbH - Robert Bosch GmbH
Photovoltaics

Bosch Solar Energy AG - Bosch Solar Wafers GmbH - Robert Bosch GmbH

Site expansion for the production of crystalline solar cells and wafers in Arnstadt

3D design of the ventilation plant Cell Fab 3

Graphics: DERU

  • New construction, extension and optimisation of the technical systems and supply technology
  • Hook up and hook down engineering
  • Planning of tool relocations
  • Compilation of facility descriptions, hazard assessment and work instructions
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Production of wafers
  • Manufacturing of crystalline, silicon-based thick-film solar cells
  • Module production

Number of tool movements:
244
Project run time:
2008-2013

Logo von Pharmaceutical production
Life Science

Pharmaceutical production

Consulting service for alternative concepts for the combined steam, hot water and power generation by steam turbine in Weimar
  • Comparison of different procedures
  • Consulting for
    • Heat supply systems
    • Power systems

Project run time:
08/2012-10/2012

Logo von Fraunhofer Institute for Cell Therapy and Immunology
Research and teachingLife Science

Fraunhofer Institute for Cell Therapy and Immunology

New construction of the first extension building in Leipzig

Architecture: Heinle, Wischer und Partner, Stuttgart

Photo: DERU

  • Laboratories of the security level 2 according to German GenTG
  • GMP labs
  • Small and large animal surgeries
  • Veterinary diagnostics (MRT)
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Gross floor space:
ca. 3,760 m²
Main floor space:
ca. 1,570 m²
Clean room space:
ca. 450 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of technical systems:
ca. 5.7 m EUR plus VAT
Project run time:
2008-2013

Logo von All Silicon System Integration Dresden (ASSID)
Research and teachingSemi-conductors

All Silicon System Integration Dresden (ASSID)

Conversion of a clean room at the Fraunhofer IZM in Moritzburg

Photo: DERU

  • Engineering of
    • Energy saving as well as adjustment of basic supply systems
    • Clean room conversion
    • Hook down / relocation / Hook up for existing equipment
    • Hook up of new equipment
    • Waste water treatment systems
    • Retrofitting and new construction of process gas supply systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 4,300 m²
Clean room space:
ca. 756 m²
Number of tool relocations:
37
Number of new tools:
32
Costs of the technical systems:
ca. 4.7 m EUR plus VAT
Project run time:
2010-2011

Logo von Freiberger Compound Materials GmbH
Semi-conductors

Freiberger Compound Materials GmbH

Set up of a combined heat and power plant (trigeneration) in Freiberg

Photos: DERU

  • Analysis of the energy flows in all energy supply and consumer systems by simulation
  • Engineering of
    • Sewage, water and gas systems
    • Heat supply systems
    • Refrigeration systems
    • Power systems
    • Building automation systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Total output of the two identical CHP modules:
1,200 kWel
1,586 kWth
Refrigerating capacity of the absorption refrigeration system:
800 kW
Investment costs:
ca. 2.3 m EUR
Project run time:
2008-2011

Logo von Pharmaceutical production
Life Science

Pharmaceutical production

Set up of a cytostatic production area of a pharmacy in Dresden
  • Consulting
  • Layout design
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to approval engineering

Scope:
3 production rooms with three safety cabinets each
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2010-2011

Logo von Pharmaceutical production
Life Science

Pharmaceutical production

GMP qualification of a cytostatic production area of a pharmacy in Plauen
  • GMP consulting
  • Supervision of the construction design
  • Qualification of the GMP relevant devices, supply systems and rooms
    • Ventilation and air-conditioning systems
    • Monitoring system
    • Compressed air and nitrogen supply systems
    • Safety workbenches, fridges, autoclave, hot air steriliser
  • Qualification phases
    • DQ, IQ, OQ

Clean room space:
ca. 100 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Project run time:
2009-2011

Logo von APOGEPHA Arzneimittel GmbH
Life Science

APOGEPHA Arzneimittel GmbH

Conversion of the pharmaceutical production area in Dresden

Photo: APOGEPHA

  • Engineering of the building services
  • Gradual detail engineering and tender
  • Technical consulting at the construction site
  • Consulting services
  • Qualification according to GMP
    • Assistance in compiling specifications (solvents, compressed air and nitrogen)
    • Execution of IQ and OQ for solvent supply systems (IPA and acetone)

Costs of the building services:
ca. 1.5 m EUR plus VAT
Project run time:
2010-2011

Logo von Plastic Logic GmbH
Semi-conductors

Plastic Logic GmbH

New construction of a production clean room and its appendant administration building in Dresden

Graphics: DERU

  • Administration building:
    • All technical systems
  • Production hall:
    • Heat supply systems
    • Ventilation and air-conditioning systems
    • Media supply systems
      • Process cooling water
      • High-purity gases and bulk gases
      • Basic chemicals
      • High-purity water
    • Building automation systems
  • Hook up engineering
  • Detail engineering to construction supervision

Gross floor space:
ca. 9,000 m²
Gross volume capacity:
ca. 86,000 m³
Clean room space:
ca. 4,000 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Project run time new construction:
2007-2008
Project run time hook up:
2007-2010

Logo von Leibniz Institute for Solid State and Materials research Dresden
Research and teaching

Leibniz Institute for Solid State and Materials research Dresden

Installation of a helium liquefaction plant including high pressure depot in Dresden

Photo: IFW Dresden

  • Engineering of
    • Sanitary and heating systems
    • Smoke extraction systems
    • Electrical systems
      • Safety lighting
      • Lightning protection plan
      • Fire alarm systems
    • Media supply systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Project management of architectural and engineering services

Gross floor space:
ca. 365 m²
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
25 m³ geometric storage volume at 200 bar correspond to ca. 5,000 m³ He
Overall costs:
ca. 2.8 m EUR plus VAT
Project run time:
2007-2010

Logo von Pharmaceutical production
Life Science

Pharmaceutical production

New construction of an Highly Purified Water system as well as conversion of a waste water system in Halle (Saale)
  • GMP system for manufacturing pharmaceutical proteins
  • Engineering of
    • Media supply systems (water treatment)
    • Waste water systems
    • Power systems
    • Building automation system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Generation capacity of the Highly Purified Water (WHP) system:
1.5 m³/h
Retrofit of storage tank pure steam generator:
500 kg/h
Costs of the technical systems:
ca. 326,000 EUR plus VAT
Project run time:
2009-2010

Logo von Forschungsinstitut für Leder und Kunststoffbahnen FILK
Life ScienceResearch and teaching

Forschungsinstitut für Leder und Kunststoffbahnen FILK

Set up of a clean room technical centre for the production of collagen in Freiberg

Photo: FILK

  • Two independent processing rooms for wet and dry processes
  • Installations in an institute building from around 1900
  • Engineering of the technical systems including clean room construction
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Coordination of all parties involved

Gross floor space:
ca. 215 m²
Floor space:
ca. 70 m²
Clean room class:
8 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 433,000 EUR
Project run time:
2008-2009

Logo von X-FAB Dresden GmbH & Co. KG
Semi-conductors

X-FAB Dresden GmbH & Co. KG

Conversion of central media systems as well as set up of an 8-inch production line in Dresden

Photos: DERU

  • Hook up engineering
  • Conversion and extension of
    • Process exhaust air systems and a clean room air handling unit
    • Central chemicals supply systems
    • Bulk and process gas supply systems
    • Highly Purified Water systems
    • Waste water systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Planning and monitoring of the move in

Number of new tools:
30
Number of tool relocations:
6
Project run time:
2008-2010
 

Logo von Center of Organic Materials and Electronic Devices
Research and teachingSemi-conductors

Center of Organic Materials and Electronic Devices

Conversion of a clean room at the Fraunhofer IPMS in Dresden

Photo: IPMS

  • Conversion while operations were running
  • Engineering of
    • Sanitary and heating systems
    • Ventilation, air-conditioning and refrigeration systems
    • Electrical systems
    • Process exhaust air systems
    • Ultrapure water systems
  • Fire protection measures
    • Sprinklers
    • Fire alarm systems throughout facilities
    • Smoke extraction systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 7,740 m²
Clean room space:
ca. 900 m²
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.25 m EUR plus VAT
Project run time:
2007-2009

Logo von University of Bielefeld with an area of use for computer-assisted biotechnology at the University of Applied Sciences Bielefeld
Research and teachingLife Science

University of Bielefeld with an area of use for computer-assisted biotechnology at the University of Applied Sciences Bielefeld

New construction of a lab facility for genomic and bioinformatics in Bielefeld

Architecture: BLB NL Bielefeld

Photo: DERU

  • Labs of the safety classes 1 and 2 according to the German GenTG
  • Chemicals of the protection level IV of the German GefStoffV (HSA)
  • Clean rooms
  • Labs for the nanosciences with vibration-free work places (attosecond spectroscopy, ultra-microscopy)
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 10,000 m²
Main floor space:
ca. 4,400 m²
Lab space:
ca. 2,700 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 13.3 m EUR plus VAT
Project run time:
2003-2009 (in two construction stages)

Logo von Technische Universität Chemnitz
Research and teachingSemi-conductors

Technische Universität Chemnitz

New construction of the Institute for Physics including a clean room "wafer processing" in Chemnitz

Architecture: rohdecan Architekten, Dresden

Photo: DERU

  • Labs, clean rooms and offices
  • Geothermal heat exchanger
  • Helium recovery
  • Engineering of any technical systems except electrical systems
  • Hook up engineering
    • Equipment for the microelectronics
    • Equipment for physics
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 11,200 m²
Main floor space:
ca. 4,920 m²
Clean room space:
ca. 510 m²
Clean room classes:
7 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 6.1 m EUR plus VAT
Project run time:
2005-2008

Logo von NaMLab gGmbH
Research and teachingSemi-conductors

NaMLab gGmbH

New construction of a lab and office building including a clean room in Dresden

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of
    • Ventilation, air-conditioning and refrigeration systems
    • Conveying systems
    • Technical gases with gas detection systems, compressed air and vacuum
    • Lab equipment
    • HPW, neutra and process cooling water systems
  • Hook up engineering
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 1,500 m²
Number of tools:
21
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.6 m EUR plus VAT
Project run time:
2006-2008

Logo von Fraunhofer Institute for Cell Therapy and Immunology
Research and teachingLife Science

Fraunhofer Institute for Cell Therapy and Immunology

New construction of the main building in Leipzig

Architecture: Heinle, Wischer und Partner, Stuttgart

Photo: DERU

  • Cell culture labs, biological, biochemical and chemical labs of the security level 2 according to German GenTG
  • Isotope lab
  • Cold storage cells up to
    -20 °C
  • Offices, cafeteria, lecture hall and library
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 10,500 m²
Main floor space:
ca. 4,130 m²
Lab space:
ca. 2,100 m²
Costs of the technical systems:
ca. 6.9 m EUR plus VAT
Project run time:
2006-2008

Logo von Federal Environment Office Bad Elster
Life ScienceResearch and teaching

Federal Environment Office Bad Elster

Conversion and modernisation of labs in Bad Elster

Photo: DERU

  • Labs of the security level 2 according to German GenTG
  • Radiologic labs
  • Wet-chemical labs
  • Installations while operation was running in four construction stages
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Leading project coordination

Gross floor space:
ca. 2,550 m²
Lab space:
ca. 890 m²
Costs of the technical systems:
ca. 1.7 m EUR plus VAT
Project run time:
2003-2007
 

Logo von Technology and Founder's Centre Halle GmbH
Life Science

Technology and Founder's Centre Halle GmbH

Supply technology for a pilot plant for producing pharmaceutical proteins in Halle (Saale)

Photos: DERU

  • Disposal and supply technology
    • Aqua purificata generation and distribution
    • Pure steam and process steam generation and distribution
    • Cleaning-in-place systems
    • Process air, N2, O2
    • Buffer preparation, CIP-chemicals
    • Waste water deactivation
  • Service phases according to German HOAI
    • Preliminary engineering to construction
  • Qualification according to GMP (QMP..PQ1)

GMP clean room space:
ca. 800 m²
Clean room classes:
8 to 5 according to DIN EN ISO 14644-1
Security levels according to German GenTG:
S1, S2
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2006-2007

Logo von Fraunhofer Institute for Photonic Microsystems and Fraunhofer Institute for Nondestructive testing
Research and teachingSemi-conductors

Fraunhofer Institute for Photonic Microsystems and Fraunhofer Institute for Nondestructive testing

Modernisation of the buildings 55 and 56 in Dresden

Architecture: KILIANARCHITEKTEN, Dresden

Photo: DERU

  • Physical and chemical labs as
    • X-ray tomography, focused ion beam lab, laser measuring room, microscopy lab, radionuclide lab and X-ray diffraction
    • Clean rooms
  • Installation while operation running
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 16,000 m²
Main floor space:
ca. 7,900 m²
Lab space:
ca. 2,300 m²
Clean room classes:
partially 6, 5 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.5 m EUR plus VAT
Project run time:
2003-2006 (in several construction stages)

Logo von Technical University Dresden
Research and teachingSemi-conductors

Technical University Dresden

New construction of a clean room section at the Mierdel building in Dresden

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of media supply and disposal systems
  • Layout design and technical room book
  • Hook up engineering
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 2,170 m²
Number of tools:
36
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 1.45 m EUR plus VAT
Project run time:
2002-2006

Logo von Fraunhofer Institute for Cell Therapy and Immunology
Research and teachingLife Science

Fraunhofer Institute for Cell Therapy and Immunology

Set up of GMP labs for the Fraunhofer IZI at the BioCity Leipzig

Photos: DERU

  • GMP labs of the security level 2 according to German GenTG
  • 4 independent process suites for changing users
    • 8 sterile labs (clean room class B)
    • Weighing cabinets and preparation rooms (clean room class C)
    • Washing area and cryo storage
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Gross floor space:
ca. 500 m²
Clean room space:
ca. 355 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of the technical systems:
ca. 1.6 m EUR plus VAT
Project run time:
2005-2006

Logo von SOLARWATT GmbH
Photovoltaics

SOLARWATT GmbH

New construction of a production facility in Dresden

Photo: DERU

  • Production facility for solar modules, set up in several construction stages
  • Logistics and packaging
  • Complete development
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space 1st construction stage:
ca. 7,500 m²
Gross floor space 2nd construction stage:
ca. 9,300 m²
Costs of the technical systems (1st and 2nd construction stage):
ca. 5.2 m EUR plus VAT
Project run time:
2002-2006

Logo von Global Digital Disc GmbH & Co. KG
Semi-conductors

Global Digital Disc GmbH & Co. KG

Conversion of a hall into a production facility for optical data storage in Ottendorf-Okrilla

Photo: DERU

  • Site development
  • Engineering of any technical systems as
    • Catalytic combustion for air containing solvent with heat recovery
    • Clean room construction
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Approval procedure according to German BImSchG
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 4,500 m²
Clean room space:
ca. 1,100 m²
Clean room space:
8 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.9 m EUR plus VAT
Project run time:
2001-2003