Sector and competence filter

Berliner Wasserbetriebe
New laboratory building of Berliner Wasserbetriebe at the Jungfernheide site
Architecture and Image: LKK Lehrecke Kammerer Keiß
Gross floor space:
ca. 7,248 m²
Floor space 1-7 according to
German DIN 277-1:
ca. 3,454 m²
Lab space:
ca. 1,900 m²
Costs of the technical systems:
ca. 9.0 m EUR plus VAT
Project run time:
since 2022
- Physical, chemical, physico-chemical, biological and microbiological laboratories for the analysis of drinking water, ground and surface water, sludge, waste water and gas
- Safety level S1 and S2 laboratories according to GenTG
- Planning of all facility groups
- Layout and laboratory planning
- •esting laboratory according to ISO/IEC 17025
- Certification according to the assessment system for sustainable building (BNB): Silver service
- phases according to HOAI
- basic evaluation to draft planing

Charité – Universitätsmedizin Berlin
New construction for the Berlin Center for AdvancedTherapies (BeCAT)
Entwurf: DGI Bauwerk, Berlin
Visualisierung: IMAGINA | Visual Collaboration
- Development and application of Advanced Therapy Medicinal Products (ATMP)
- 4 independent GMP clean room units
- Laboratories of the security level 2 according to German BioStV and GenTSV
- Cryo storage, cold storage cells (4 °C and
- -20 °C) as well as ultra-low freezers (-80 °C)
- Engineering of any technical systems
- Layout and lab design
- GMP clean room planning
- Service phases according to German HOAI
- Preliminary engineering and basic engineering
- Qualification according to GMP
Gross floor space:
ca. 3.480 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 1.242 m²
Clean room space:
ca. 800 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of the technical systems:
ca. 13.1 m EUR plus VAT
Project run time:
since 2018

Westsächsische Hochschule Zwickau - University of Applied Sciences
New construction of the High-technology Center in Zwickau
Architecture and image: Architekturbüro Raum und Bau GmbH – Architektengemeinschaft Zimmermann
- New research and teaching building including historic structures
- Micro and nanostructruring, optic technology, medical technology as well as physics
- Labs, measuring and clean rooms, practical training rooms as well as offices
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 7,960 m²
Floor space 1-6 according to German DIN 277-1:
ca. 2,600 m²
High-technology platform/
Clean room space:
ca. 800 m²
Clean room classes:
7, 5 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 16.0 m EUR plus VAT
Project run time:
since 2016

Fraunhofer Institute for Telecommunications Heinrich Hertz Institute (HHI)
Renewal of refrigeration and expansion of process cooling water system for the Fraunhofer HHI at Berlin
Source: 20200531 IMG 0307 by sebaso-2.jpg
- Conversion of the refrigeration systems during operation
- Engineering of
- Sanitary and refrigeration systems
- Power systems
- Process refrigeration systems
- Building automation systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Preliminary measure extension of process cooling system with plate heat exchanger and high-pressure centrifugal pumps
Renewal of two cooling machines 6/12 °C: 800 kW cooling capacity including recooling plant
New construction of refrigeration center with three cooling machines: 750 kW cooling capacity including recooling plant
Costs of the technical systems:
ca. 1,3 Mio. EUR plus VAT
Project run time:
2016-2020

Halbleiterlabor der Max-Planck-Gesellschaft
New construction of the MPG Halbleiterlabor (semiconductor laboratory) in Garching
Architecture and image:
Carpus+Partner AG, Aachen
- Research clean room for developing of semiconductor radiation detectors
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Currently detail engineering
Gross floor space:
ca. 6,650 m²
Clean room space:
ca. 1,500 m²
Clean room classes:
8 to 3 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 12.3 m EUR plus VAT
Project run time:
since 2016

Universität Regensburg
New construction of the Regensburg Center for Ultrafast Nanoscopy (RUN)
Entwurf: Fritsch + Tschaidse Architekten
Gross floor space:
ca. 6.304 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 2.044 m²
Clean room space:
ca. 700 m²
Clean room class:
8 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 8.1 m EUR plus VAT
Project run time:
since 2018
- Interdisciplinary research (biology / preclinical medicine, chemistry / pharmacy, physics)
- Microscopy and wet labs, auditorium, offices and seminar rooms
- Labs of the security levels 1 and 2 acc. to German GenTSV
- Engineering of the facility groups 1 - 3, 7 and 8
- Layout and lab design
- Service phases according to German HOAI
- Pre-planning to project supervision

Friedrich-Alexander-Universität Erlangen-Nürnberg
New construction for technical chemistry at the Friedrich-Alexander University Erlangen-Nürnberg
doranthpostarchitekten
Gross floor space:
ca. 14,000 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 5,330 m²
Lab space:
ca. 2,940 m²
Costs of the technical systems:
ca. 18.3 m EUR plus VAT
Project run time:
since 2020
- Chemistry and physics laboratories, special laboratories (electron microscopy rooms and high-pressure laboratory), some with special structural and technical requirements
- Separate air conditioning systems with increased requirements for special laboratories and hazardous materials storage facilities
- Office, social and meeting rooms, seminar rooms, workshops and storage areas
- Planning of all facility groups (1-3, 7 and 8) except electrical and laboratory planning
- Service Phases according to HOAI
- pre-Planing to project monitoring

Freie Universität Berlin
New construction of the Institute for Food Safety and Hygiene (ILH) in Berlin
wulf architekten
Gross floor space:
ca. 5,063 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 2,000 m²
Costs of the technical systems:
ca. 5,4 Mio. EUR plus VAT
Project run time:
since 2018
- Teaching rooms, laboratories, technical center, demonstration section hall, offices and meeting rooms
- Labs of the security level 2 according to German BioStoffV as well as GenTSV
- Engineering of any technical systems
- Layout and lab design
- Service phases according to German HOAI
- pre-planning to preparation of the contract awarding
- Certification according to the German Evaluation system Sustainable Building (BNB): Gold

Technische Universität Chemnitz
Replacement clean room Center for Microtechnologies (ZfM) at the Chemnitz University of Technology
heinlewischer
Gross floor space:
ca. 17,485 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 2,836 m²
Clean room space:
ca. 1,600 m²
Clean room classes:
4 to 7 according to DIN EN ISO 14644-1
the technical systems:
ca. 25,4 Mio EUR plus VAT
Project run time:
2020-today
- Clean rooms, workshops, physics laboratory, offices and storage areas
- Planning of all technical installations incl. clean room equipment/furnishing
- Creation and updating of the technical room book
- Proportionate participation in
- Creation of fire matrix
- Technical monitoring and commissioning management
- Service phases according to HOAI
- Basic evaluation to draft planning

Max-Planck-Gesellschaft zur Förderung der Wissenschaften e. V.
New construction of an extension building for the Max Planck Institute for Microstructure Physics in Halle
Burckhardt+Partner GmbH
- Multidisciplinary research with physical, chemical, biological-medical laboratories, including S2 according to GenTSV
- Engineering of
- Sewage, water, gas and heat supply systems
- Ventilation, air-conditioning and refrigeration systems
- Clean room construction
- Media supply systems
- Medical and laboratory systems
- Building automation systems
- Service phases according to German HOAI
- Pre-planning to project supervision
Gross floor space:
ca. 12.535 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 5.650 m²
Clean room space:
ca. 700 m²
Clean room class:
7 to 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 20,9 m EUR plus VAT
Project run time:
since 2019

Friedrich-Alexander University Erlangen-Nürnberg
Renewal of Ultrapure Water Treatment Systems
© DERU-Bestehende Reinstwasseranlage
- Ultrapure water treatment for diverse process equipment for semiconductor prototype production
- Upgrading during ongoing research operation
- DERU as general planner
- Planning of all facility groups except conveyos
- Structural design by BGF Baubüro Freiberg GmbH
- Dismantling of existing ultrapure water treatment
- retrofitting of the room, room-in-room construction in steel design
- Commissioning of the new ultrapure water plant Work phases according to HOAI
- Pre-planning to construction supervision
Ultrapure water quality:
according to SEMI standard
Cleanroom space:
ca. 600 m², ISO 4 nach ISO 14644-1
ca. 400 m², ISO 6 nach ISO 14644-1
Costs of the technical systems:
ca. 3,3 EUR plus VAT
Project run time:
since 2020

TGZ Halle Technologie- und Gründerzentrum Halle GmbH
New construction of the Innovation Hub at the Technology and Start-up Center in Halle (Saale)
ARGE Dietrich + Untertrifaller Architekten + Aline Hielscher Architektur
- Incubator for start-ups in the fields of biomedicine and life sciences
- Flexible reusable workshop, production laboratory and office space
- Planning of all technical facilities
- 33 underground parking spaces
- Service phases according to HOAI
- Basic evaluation to project supervision/support
Gross floor space:
ca. 4.929 m²
Floor space 1-6 according to
German DIN 277-1:
ca. 2.145 m²
Costs of the technical systems:
ca. 4.0 million euros plus VAT
Project run time:
since 2022

Bavaria Film GmbH
Erneuerung und Erweiterung der Gebäudeautomation für die Liegenschaft der Bavaria Film GmbH in Geiselgasteig
Bavaria
- Erneuerung der Managementebene bis 15.000 Datenpunkte
- Teilmigration Automationsebenen mit offener BACnet-Technologie 5.000 Datenpunkte
- Ausschreibung einer Energiemanagementsoftware
- Beratung einschließlich Erstellung eines Marktspiegels für Gebäudeleittechnik- Software
- Ausschreibung eines Rahmenvertrags
- Leistungsphasen nach HOAI
- Vor- und Entwurfsplanung, Ausführungsplanung sowie Vorbereitung und Mitwirkung bei der Vergabe
Kosten der technischen Anlagen:
ca. 616.380 EUR zzgl. USt. (Kostenberechnung)
Projektlaufzeit:
seit 01/2022

AEMtec GmbH
New construction of an extension building including clean room and offices in Berlin
AEMtec GmbH
- General engineering
- Building
- Supporting structure
- Technical systems
- Outdoor facilities
- Service phases according to German HOAI
- Pre-planning to supervision/support
Gross floor space:
ca. 3,944 m²
Clean room space:
ca. 1,483 m²
Clean room classes:
8, 7 and 6 according to
DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.9 m EUR plus VAT
Project run time:
2018-2022, currently service phase 9

Fraunhofer Institute for Integrated Systems and Device Technology
Renewal of cooling machines and drycoolers for the Fraunhofer IISB at Erlangen
Photo: DERU
- Conversion of the refrigeration systems during operation
- Renewal of power supply lines and MSR technology
- Engineering of
- refrigeration systems
- Power systems
- User-specific systems
- Building automation systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Renewal of cooling machines 6/12 °C: approx. 600 kW cooling capacity
Installation of rental cooling machines: approx. 500 kW cooling capacity
Installation of two turbo cooling machines 12/17 °C: approx. 690 kW cooling capacity
Installation of two hybrid dry coolers: approx. 850 kW re-cooling capacity
Costs of the technical systems:
ca. 1,5 Mio. EUR plus VAT
Project run time:
10/2016-09/2017 (Subproject 1)
04/2018-02/2021 (Subproject 2-4)

Friedrich-Alexander Universität Erlangen-Nürnberg
New construction of the Erlangen Centre for Astroparticle Physics (ECAP)
Architecture and image:
Dichter + Glass Kramer Löbbert Architekten, Berlin
- University research in astroparticle physics
- Labs and assembly halls, offices and meeting rooms
- Engineering of
- Gases, compressed air, helium recovery systems, gas detection systems
- Lab equipment and special internals
- Fire-extinguishing systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 9,170 m²
Floor space 1-6 according to German DIN 277-1:
ca. 3,500 m²
Lab space:
ca. 2,330 m²
Costs of the technical systems:
ca. 1.6 m EUR plus VAT
Project run time:
2017-2022

Leibniz Institute for Natural Product Research and Infection Biology Hans Knöll Institute
New construction of the HKI Biotech Center in Jena
Architecture and image: Nickl & Partner Architekten AG, Berlin
- Chemical, analytics and cell culture labs as well as electrophoresis and PCR labs
- Labs of the security level 2 according to German GenTG
- Offices and seminar area
- Engineering of
- Power systems
- Telecommunication and IT systems
- Elevator
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 5,730 m²
Floor space 1-6 according to German DIN 277-1:
ca. 2,095 m²
Lab space:
ca. 890 m²
Costs of the technical systems:
ca. 2.8 m EUR plus VAT
Project run time:
2017-2022

Wismut GmbH
New construction of a functional building in Königstein / Leupoldishain
Architecture: BBF Baubüro Freiberg GmbH
Photo: DERU
- Remediation of uranium mining legacies
- Engineering of
- Sewage, water and heat supply systems
- Partial air conditioning and refrigeration systems
- Compressed air and gas supply systems (nitrogen, argon, methane, ammonia)
- Lab equipment
- Process exhaust air systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 3,075 m²
Floor space 1-6 according to German DIN 277-2:
ca. 1,340 m²
Lab space:
ca. 240 m²
Costs of the technical systems:
ca. 2.1 m EUR plus VAT
Project run time:
2015-2021

Fraunhofer Institute for Integrated Circuits
New construction of the Institute Division EAS for the Fraunhofer IIS in Dresden
Architecture and image: Heinle, Wischer und Partner Freie Architekten
- Electronics labs, experimental halls and measuring rooms, offices and meeting rooms, cafeteria and library
- Engineering of
- Power systems
- Telecommunication and IT systems
- Elevator
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 11,190 m²
Floor space 1-6 according to German DIN 277-1:
ca. 4,560 m²
Lab and experimental space:
ca. 990 m²
Costs of the technical systems:
ca. 3.2 m EUR plus VAT
Project run time:
2016-2021

Friedrich-Alexander Universität Erlangen-Nürnberg
New construction of an Interdisciplinary Centre for nanostructured film (IZNF) in Erlangen
Architecture: doranth post architekten GmbH, München
Photo:DERU
- 50 physical and chemical labs, including FIB and TEM measuring rooms as well as labs of the security level 2, offices
- Engineering of
- Sewage, water and heat supply systems
- Ventilation, air-conditioning and refrigeration systems
- Clean room construction
- Media supply systems
- Building automation system
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 11,300 m²
Floor space 1-6 according to German DIN 277-2:
ca. 4,640 m²
Lab space:
ca. 1,725 m²
Clean room space:
ca. 170 m²
Clean room class:
8 acc. to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 6.8 m EUR plus VAT
Project run time:
2014-2019

Fraunhofer Institute for Integrated Systems and Device Technology
New construction of an extension building in Erlangen
Architecture: weinbrenner.single.arabzadeh, architektenwerkgemeinschaft
Image: 3DBO
Grafik +Visualisierung,
Andreas Boldt
- Labs and working rooms, technical centre for HVDC systems, workshops as well as offices
- Engineering of
- Sewage, water and heat supply systems
- Ventilation, air-conditioning and refrigeration systems
- Media supply systems
- Special equipment
- CHP and industrial scale refrigeration storage
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 4,220 m²
Floor space 1-6 according to German DIN 277-2:
ca. 1,920 m²
Technical centre and lab space:
ca. 1,170 m²
Costs of the technical systems:
ca. 2.1 m EUR plus VAT
Project run time:
2014-2019

Technische Universität Chemnitz
New construction of the Centre for materials, architectures and integration of nanomembranes (MAIN) in Chemnitz
Architecture and image: Heinle, Wischer und Partner, Dresden
- Physical and chemical labs as well as clean rooms
- Altogether 11 lab cluster
- Engineering of any technical systems
(except conveying systems) - Layout and lab design
- Hook up engineering
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Support
Gross floor space:
ca. 9,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 3,800 m²
Clean room space:
ca. 400 m²
Clean room class:
7 to 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 11.4 m EUR plus VAT
Project run time:
2013-2019

Mechanical Engineering
Installation of a clean room for EUV systems in Ditzingen
Photo: DERU
- Integration of large-scale clean rooms into a new building
- Engineering of
- Clean room walls
- Raised floors
- Furnishing of the clean room wardrobes
- Service phases according to German HOAI
- Basic engineering (as consulting service),
- Detail engineering
- Preparation of bid invitations
- Assistance in the award procedures
- Construction supervision (partly)
Clean room space:
ca. 3,100 m²
Clean room classes:
8 to 5 according to DIN EN ISO 14644-1
Project run time:
2016-2018

European X-Ray Free-Electron Laser Facility GmbH
New construction of the main building in Schenefeld
Architecture and image: BLUNCK+MORGEN, Hamburg
- Labs of the security levels 1 and 2 according to German GenTG, laser rooms, cleanrooms as well as offices
- Engineering of any technical systems (except conveying systems) for the main building above ground
- Layout and lab design
- Engineering of media and energy supply systems in the subterranean experimental hall
- Services phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 16,765 m²
Main floor space:
ca. 8,000 m²
Lab space:
ca. 2,400 m²
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2012-2017

University of Applied Sciences Mittweida
New construction of the Institute for Laser Technology in Mittweida
Architecture: pbr Planungsbüro
Rohling AG
Photo: DERU
- Labs and clean rooms, offices and meeting rooms
- Engineering of
- Clean room ventilation systems
- Clean room construction
- Media supply systems
- Laboratory equipment
- Process refrigeration and process exhaust air systems
- Building automation systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 6,410 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,650 m²
Clean room space:
ca. 500 m²
Clean room classes:
8 and 6 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2012-2017

IHP GmbH Leibniz-Institut für Innovative Mikroelektronik
Enlargements, conversion and restructuring measures at the IHP in Frankfurt (Oder)
Photo: DERU
- Tender procedures for general agreements of executing firms (technical as well as structural systems)
- New construction and conversion of central media systems
- Conversion of chemical and physical labs
- Installation of the Nano lab clean room
- Hook up engineering
- Services phases according to German HOAI
- Preliminary engineering to construction supervision
Spaces:
ca. 450 m² (labs)
ca. 300 m² (Nano lab clean room)
ca. 280 m² (work shop)
Clean room class:
6 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 3 m EUR plus VAT
Project run time:
2014-2016

Forschungsinstitut für Leder und Kunststoffbahnen FILK
Installation of a lab and communication complex in Freiberg
Photo: DERU
- Chemical-physical labs, partially labs of the security levels 1 and 2 according to German GenTG
- Offices, meeting and seminar rooms, aula and lecture room as well as cafeteria
- Engineering of any technical systems
(except conveying systems) - Layout and lab design
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 5,155 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,590 m²
Lab space:
ca. 1,250 m²
Costs of the technical systems:
ca. 3.9 m EUR plus VAT
Project run time:
2010-2016

Freiberg City Administration
Inside modernisation of the historical granary in Freiberg
Photo: DERU
- Late Gothic storehouse
- City library and commercial units
- Engineering of
- Heat supply, sanitary and ventilation systems
- Heat pumps with geothermal probe
- Wall surface heating
- Building automation systems
- Heat supply, sanitary and ventilation systems
- Calculation of profitability
- Service phases according to German HOAI
- Basic evaluation to construction supervision
- Support
Gross floor space:
ca. 4,290 m²
Gross volume capacity:
ca. 16,470 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,030 m²
Costs of the technical systems:
ca. 730,000 EUR plus VAT
Project run time:
2013-2015
(Support 2015-2020)

Fraunhofer Institute for Silicon Technology
New construction of a second clean room in Itzehoe
Architecture and image: HTP Architekten, Brunswick
- Research clean room for developing
- Components of power electronics
- Novel microsensors
- Engineering of any technical systems
- Layout design
- Hook up engineering
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Support
- Project coordination
Gross floor space:
ca. 12,170 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,500 m², thereof
ca. 1,500 m² clean room space
Clean room class:
5 according to DIN EN ISO 14644-1 (partially ISO 4)
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2009-2015
(Support 2015-2020)

Fraunhofer Institute for Transportation and Infrastructure Systems
New construction of a technical centre with connected oval test track in Dresden
Architecture: KILIANARCHITEKTEN, Dresden
Photo: DERU
- Technical centre including
- Test hall and car workshop
- Engine and battery test benches
- Measuring rooms and offices
- Crane way 2.5 t
- Transfer of the existing container location
- Engineering of any technical systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 1,615 m²
Floor space 1-6 according to German DIN 277-2:
ca. 990 m²
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2011-2015

Helmholtz-Zentrum Dresden-Rossendorf e. V.
Preparation for the set up of a Super-SIMS in Dresden-Rossendorf
Photo: HZDR
- Set up of a Super-SIMS in the 6 MV tandem accelerator hall
- High-voltage protection
(30 kV) - Engineering of
- Ventilation systems and room-in-room construction
- Power, Telecommunication and IT systems
- Media supply systems
- Building automation systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
SIMS = Secondary ion mass spectrometry
- Ultrasensitive analytical method for the determination of stable elements and isotopes
Accelerator hall:
Radiation protection controlled area
Costs of the technical systems:
ca. 300,000 EUR plus VAT
Project run time:
2012-2014

Helmholtz-Zentrum Dresden-Rossendorf e. V.
Installation of a helium liquefaction plant including high pressure depot in Dresden-Rossendorf
Photo: DERU
- New construction of a building as well as installation of the helium liquefaction plant
- Engineering of
- Sewage and water systems
- Ventilation and air-conditioning systems
- Power systems
- Telecommunication and IT systems
- Media supply systems
- Building automation systems
- Service phases according to German HOAI
- Basic engineering to construction supervision
Gross floor space:
ca. 285 m²
Gross volume capacity:
ca. 1,800 m³
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
35 m³ geometric storage volume at 200 bar
Costs of the technical systems:
ca. 620,000 EUR plus VAT (without liquefaction plant)
Project run time:
2012-2014

Crime scene task force at Landeskriminalamt Magdeburg
Dactyloscopic lab in Magdeburg
Photos: DERU
- Forensic lab of the security level 2 according to German GenTG
- Engineering of lab systems as
- Dissecting table with air supply element
- 4 laboratory fume hoods coated with stainless steel, one of it walk-in
- Air locks for material and staff
- Service phase according to German HOAI
- Preliminary engineering to construction supervision
Floor space 1-6 according to German DIN 277-2:
ca. 153 m²
Costs of the technical systems:
ca. 163,000 EUR plus VAT
Project run time:
2012-2014

Technical University Dresden
New construction of a research facility at the Mierdel building in Dresden
Architecture: Blum & Schultze Architekten, Dresden
Photo: DERU
- Engineering of
- Technical gases, compressed air, central vacuum systems
- Gas detection systems
- HPW systems
- Process cooling water systems
- Lab equipment
- Layout design
- Hook up engineering
- Service phase according to German HOAI
- Preliminary engineering to construction supervision
- Organisation and monitoring of the relocation
Gross floor space:
ca. 7,320 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,268 m²
Number of tools:
48
Costs of the technical systems:
ca. 1.3 m EUR plus VAT
Project run time:
2009-2013

Fraunhofer Institute for Machine Tools and Forming Technology
New construction of a model factory for resource efficient production in Chemnitz
Architecture: Stefan Ludes Architekten, Berlin
Photo: DERU
- Set up of an energy self-sufficient factory with
- CHP
- Energy storage system flywheel mass
(only planning) - Photovoltaics systems
- Engineering of
- Power systems
- Telecommunication and IT systems
- Conveyor systems (crane way 40 t)
- Building automation systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 3,420 m²
Gross volume capacity:
ca. 35,290 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,150 m²
Costs of the technical systems:
ca. 2.2 m EUR plus VAT
Project run time:
2010-2013

Pharmaceutical production
Consulting services for a conversion project in Dresden
- Conversion of pharmaceutical work rooms, stores, cold rooms and airlocks
- Hook up to existing basic supply systems
- Consulting for
- Ventilation and air-conditioning systems
- Building automation system
Space:
ca. 200 m²
Clean room class:
D according to annex 1 of the GMP guideline
Project run time:
06/2013-07/2013

AEMtec GmbH
New construction of a production facility including a clean room in Berlin
Architecture and image: BBF Baubüro Freiberg GmbH
- General engineering
- Building
- Supporting structure
- Technical systems
- Outdoor facilities
- Service phases according to German HOAI
- Preliminary engineering to support
Gross floor space:
ca. 5,500 m²
Clean room space:
ca. 2,000 m²
Clean room classes:
8 and 7 according to DIN EN ISO 14644-1
Project run time:
2011-2013
(Support 2013-2018)

Technical University Dresden
Conversion and modernisation of the Walther-Hempel building for the chemical institutes in Dresden
Architecture: AWB Architekten, Dresden
Photo: DERU
- Set up in 1962 in reinforced concrete skeleton construction
- Technical, macromolecular as well as specific physical chemistry, NMR spectrometer
- Engineering of
- Sewage, water and gas systems
- Heat supply systems
- Ventilation, air-conditioning and refrigeration systems
- Media supply systems
- Building automation systems
- Service phases according to German HOAI
- Basic engineering to construction supervision
Gross floor space:
ca. 5,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,430 m²
Lab space:
ca. 1,560 m²
Costs of the technical systems:
ca. 2.3 m EUR plus VAT
Project run time:
2008-2013

Bosch Solar Energy AG - Bosch Solar Wafers GmbH - Robert Bosch GmbH
Site expansion for the production of crystalline solar cells and wafers in Arnstadt
3D design of the ventilation plant Cell Fab 3
Graphics: DERU
- New construction, extension and optimisation of the technical systems and supply technology
- Hook up and hook down engineering
- Planning of tool relocations
- Compilation of facility descriptions, hazard assessment and work instructions
- Service phases according to German HOAI
- Basic evaluation to construction supervision
- Production of wafers
- Manufacturing of crystalline, silicon-based thick-film solar cells
- Module production
Number of tool movements:
244
Project run time:
2008-2013

Pharmaceutical production
Consulting service for alternative concepts for the combined steam, hot water and power generation by steam turbine in Weimar
- Comparison of different procedures
- Consulting for
- Heat supply systems
- Power systems
Project run time:
08/2012-10/2012

Fraunhofer Institute for Cell Therapy and Immunology
New construction of the first extension building in Leipzig
Architecture: Heinle, Wischer und Partner, Stuttgart
Photo: DERU
- Laboratories of the security level 2 according to German GenTG
- GMP labs
- Small and large animal surgeries
- Veterinary diagnostics (MRT)
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Qualification according to GMP
Gross floor space:
ca. 3,760 m²
Main floor space:
ca. 1,570 m²
Clean room space:
ca. 450 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of technical systems:
ca. 5.7 m EUR plus VAT
Project run time:
2008-2013

All Silicon System Integration Dresden (ASSID)
Conversion of a clean room at the Fraunhofer IZM in Moritzburg
Photo: DERU
- Engineering of
- Energy saving as well as adjustment of basic supply systems
- Clean room conversion
- Hook down / relocation / Hook up for existing equipment
- Hook up of new equipment
- Waste water treatment systems
- Retrofitting and new construction of process gas supply systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 4,300 m²
Clean room space:
ca. 756 m²
Number of tool relocations:
37
Number of new tools:
32
Costs of the technical systems:
ca. 4.7 m EUR plus VAT
Project run time:
2010-2011

Freiberger Compound Materials GmbH
Set up of a combined heat and power plant (trigeneration) in Freiberg
Photos: DERU
- Analysis of the energy flows in all energy supply and consumer systems by simulation
- Engineering of
- Sewage, water and gas systems
- Heat supply systems
- Refrigeration systems
- Power systems
- Building automation systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Total output of the two identical CHP modules:
1,200 kWel
1,586 kWth
Refrigerating capacity of the absorption refrigeration system:
800 kW
Investment costs:
ca. 2.3 m EUR
Project run time:
2008-2011

Pharmaceutical production
Set up of a cytostatic production area of a pharmacy in Dresden
- Consulting
- Layout design
- Engineering of any technical systems
- Service phases according to German HOAI
- Preliminary engineering to approval engineering
Scope:
3 production rooms with three safety cabinets each
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2010-2011

Pharmaceutical production
GMP qualification of a cytostatic production area of a pharmacy in Plauen
- GMP consulting
- Supervision of the construction design
- Qualification of the GMP relevant devices, supply systems and rooms
- Ventilation and air-conditioning systems
- Monitoring system
- Compressed air and nitrogen supply systems
- Safety workbenches, fridges, autoclave, hot air steriliser
- Qualification phases
- DQ, IQ, OQ
- DQ, IQ, OQ
Clean room space:
ca. 100 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Project run time:
2009-2011

APOGEPHA Arzneimittel GmbH
Conversion of the pharmaceutical production area in Dresden
Photo: APOGEPHA
- Engineering of the building services
- Gradual detail engineering and tender
- Technical consulting at the construction site
- Consulting services
- Qualification according to GMP
- Assistance in compiling specifications (solvents, compressed air and nitrogen)
- Execution of IQ and OQ for solvent supply systems (IPA and acetone)
Costs of the building services:
ca. 1.5 m EUR plus VAT
Project run time:
2010-2011

Plastic Logic GmbH
New construction of a production clean room and its appendant administration building in Dresden
Graphics: DERU
- Administration building:
- All technical systems
- Production hall:
- Heat supply systems
- Ventilation and air-conditioning systems
- Media supply systems
- Process cooling water
- High-purity gases and bulk gases
- Basic chemicals
- High-purity water
- Building automation systems
- Hook up engineering
- Detail engineering to construction supervision
Gross floor space:
ca. 9,000 m²
Gross volume capacity:
ca. 86,000 m³
Clean room space:
ca. 4,000 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Project run time new construction:
2007-2008
Project run time hook up:
2007-2010

Leibniz Institute for Solid State and Materials research Dresden
Installation of a helium liquefaction plant including high pressure depot in Dresden
Photo: IFW Dresden
- Engineering of
- Sanitary and heating systems
- Smoke extraction systems
- Electrical systems
- Safety lighting
- Lightning protection plan
- Fire alarm systems
- Media supply systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Project management of architectural and engineering services
Gross floor space:
ca. 365 m²
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
25 m³ geometric storage volume at 200 bar correspond to ca. 5,000 m³ He
Overall costs:
ca. 2.8 m EUR plus VAT
Project run time:
2007-2010

Pharmaceutical production
New construction of an Highly Purified Water system as well as conversion of a waste water system in Halle (Saale)
- GMP system for manufacturing pharmaceutical proteins
- Engineering of
- Media supply systems (water treatment)
- Waste water systems
- Power systems
- Building automation system
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Qualification according to GMP
Generation capacity of the Highly Purified Water (WHP) system:
1.5 m³/h
Retrofit of storage tank pure steam generator:
500 kg/h
Costs of the technical systems:
ca. 326,000 EUR plus VAT
Project run time:
2009-2010

Forschungsinstitut für Leder und Kunststoffbahnen FILK
Set up of a clean room technical centre for the production of collagen in Freiberg
Photo: FILK
- Two independent processing rooms for wet and dry processes
- Installations in an institute building from around 1900
- Engineering of the technical systems including clean room construction
- Service phases according to German HOAI
- Basic evaluation to construction supervision
- Coordination of all parties involved
Gross floor space:
ca. 215 m²
Floor space:
ca. 70 m²
Clean room class:
8 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 433,000 EUR
Project run time:
2008-2009

X-FAB Dresden GmbH & Co. KG
Conversion of central media systems as well as set up of an 8-inch production line in Dresden
Photos: DERU
- Hook up engineering
- Conversion and extension of
- Process exhaust air systems and a clean room air handling unit
- Central chemicals supply systems
- Bulk and process gas supply systems
- Highly Purified Water systems
- Waste water systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Planning and monitoring of the move in
Number of new tools:
30
Number of tool relocations:
6
Project run time:
2008-2010

Center of Organic Materials and Electronic Devices
Conversion of a clean room at the Fraunhofer IPMS in Dresden
Photo: IPMS
- Conversion while operations were running
- Engineering of
- Sanitary and heating systems
- Ventilation, air-conditioning and refrigeration systems
- Electrical systems
- Process exhaust air systems
- Ultrapure water systems
- Fire protection measures
- Sprinklers
- Fire alarm systems throughout facilities
- Smoke extraction systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 7,740 m²
Clean room space:
ca. 900 m²
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.25 m EUR plus VAT
Project run time:
2007-2009

University of Bielefeld with an area of use for computer-assisted biotechnology at the University of Applied Sciences Bielefeld
New construction of a lab facility for genomic and bioinformatics in Bielefeld
Architecture: BLB NL Bielefeld
Photo: DERU
- Labs of the safety classes 1 and 2 according to the German GenTG
- Chemicals of the protection level IV of the German GefStoffV (HSA)
- Clean rooms
- Labs for the nanosciences with vibration-free work places (attosecond spectroscopy, ultra-microscopy)
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 10,000 m²
Main floor space:
ca. 4,400 m²
Lab space:
ca. 2,700 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 13.3 m EUR plus VAT
Project run time:
2003-2009 (in two construction stages)

Technische Universität Chemnitz
New construction of the Institute for Physics including a clean room "wafer processing" in Chemnitz
Architecture: rohdecan Architekten, Dresden
Photo: DERU
- Labs, clean rooms and offices
- Geothermal heat exchanger
- Helium recovery
- Engineering of any technical systems except electrical systems
- Hook up engineering
- Equipment for the microelectronics
- Equipment for physics
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 11,200 m²
Main floor space:
ca. 4,920 m²
Clean room space:
ca. 510 m²
Clean room classes:
7 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 6.1 m EUR plus VAT
Project run time:
2005-2008

NaMLab gGmbH
New construction of a lab and office building including a clean room in Dresden
Architecture: Blum & Schultze Architekten, Dresden
Photo: DERU
- Engineering of
- Ventilation, air-conditioning and refrigeration systems
- Conveying systems
- Technical gases with gas detection systems, compressed air and vacuum
- Lab equipment
- HPW, neutra and process cooling water systems
- Hook up engineering
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 1,500 m²
Number of tools:
21
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.6 m EUR plus VAT
Project run time:
2006-2008

Fraunhofer Institute for Cell Therapy and Immunology
New construction of the main building in Leipzig
Architecture: Heinle, Wischer und Partner, Stuttgart
Photo: DERU
- Cell culture labs, biological, biochemical and chemical labs of the security level 2 according to German GenTG
- Isotope lab
- Cold storage cells up to
-20 °C - Offices, cafeteria, lecture hall and library
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space:
ca. 10,500 m²
Main floor space:
ca. 4,130 m²
Lab space:
ca. 2,100 m²
Costs of the technical systems:
ca. 6.9 m EUR plus VAT
Project run time:
2006-2008

Federal Environment Office Bad Elster
Conversion and modernisation of labs in Bad Elster
Photo: DERU
- Labs of the security level 2 according to German GenTG
- Radiologic labs
- Wet-chemical labs
- Installations while operation was running in four construction stages
- Engineering of any technical systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
- Leading project coordination
Gross floor space:
ca. 2,550 m²
Lab space:
ca. 890 m²
Costs of the technical systems:
ca. 1.7 m EUR plus VAT
Project run time:
2003-2007

Technology and Founder's Centre Halle GmbH
Supply technology for a pilot plant for producing pharmaceutical proteins in Halle (Saale)
Photos: DERU
- Disposal and supply technology
- Aqua purificata generation and distribution
- Pure steam and process steam generation and distribution
- Cleaning-in-place systems
- Process air, N2, O2
- Buffer preparation, CIP-chemicals
- Waste water deactivation
- Service phases according to German HOAI
- Preliminary engineering to construction
- Qualification according to GMP (QMP..PQ1)
GMP clean room space:
ca. 800 m²
Clean room classes:
8 to 5 according to DIN EN ISO 14644-1
Security levels according to German GenTG:
S1, S2
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2006-2007

Fraunhofer Institute for Photonic Microsystems and Fraunhofer Institute for Nondestructive testing
Modernisation of the buildings 55 and 56 in Dresden
Architecture: KILIANARCHITEKTEN, Dresden
Photo: DERU
- Physical and chemical labs as
- X-ray tomography, focused ion beam lab, laser measuring room, microscopy lab, radionuclide lab and X-ray diffraction
- Clean rooms
- Installation while operation running
- Engineering of any technical systems
- Layout design
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
Gross floor space:
ca. 16,000 m²
Main floor space:
ca. 7,900 m²
Lab space:
ca. 2,300 m²
Clean room classes:
partially 6, 5 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.5 m EUR plus VAT
Project run time:
2003-2006 (in several construction stages)

Technical University Dresden
New construction of a clean room section at the Mierdel building in Dresden
Architecture: Blum & Schultze Architekten, Dresden
Photo: DERU
- Engineering of media supply and disposal systems
- Layout design and technical room book
- Hook up engineering
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Organisation and monitoring of the relocation
Gross floor space:
ca. 2,170 m²
Number of tools:
36
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 1.45 m EUR plus VAT
Project run time:
2002-2006

Fraunhofer Institute for Cell Therapy and Immunology
Set up of GMP labs for the Fraunhofer IZI at the BioCity Leipzig
Photos: DERU
- GMP labs of the security level 2 according to German GenTG
- 4 independent process suites for changing users
- 8 sterile labs (clean room class B)
- Weighing cabinets and preparation rooms (clean room class C)
- Washing area and cryo storage
- Engineering of any technical systems
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Qualification according to GMP
Gross floor space:
ca. 500 m²
Clean room space:
ca. 355 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of the technical systems:
ca. 1.6 m EUR plus VAT
Project run time:
2005-2006

SOLARWATT GmbH
New construction of a production facility in Dresden
Photo: DERU
- Production facility for solar modules, set up in several construction stages
- Logistics and packaging
- Complete development
- Engineering of any technical systems
- Service phases according to German HOAI
- Basic evaluation to construction supervision
Gross floor space 1st construction stage:
ca. 7,500 m²
Gross floor space 2nd construction stage:
ca. 9,300 m²
Costs of the technical systems (1st and 2nd construction stage):
ca. 5.2 m EUR plus VAT
Project run time:
2002-2006

Global Digital Disc GmbH & Co. KG
Conversion of a hall into a production facility for optical data storage in Ottendorf-Okrilla
Photo: DERU
- Site development
- Engineering of any technical systems as
- Catalytic combustion for air containing solvent with heat recovery
- Clean room construction
- Service phases according to German HOAI
- Preliminary engineering to construction supervision
- Approval procedure according to German BImSchG
- Organisation and monitoring of the relocation
Gross floor space:
ca. 4,500 m²
Clean room space:
ca. 1,100 m²
Clean room space:
8 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.9 m EUR plus VAT
Project run time:
2001-2003